EZ Installation Instructions
|
INSPECT ATTIC AREA TO BE USED
- DO NOT INSTALL THE EZ ATTIC FLOORING AS TO IMPINGE WIRES
- EXERCISE LADDER SAFETY AND CAUTION WHEN WORKING IN AN ATTIC
The center placed handle makes lifting the EZ Attic through your attic hatch a snap! Having a second person to assist and hold the ladder is always a good idea!
|
|

Untie and unwrap the EZ Attic from its protective bag. Line up the EZ Attic on the attic joists and roll out. The EZ Attic is cut 50 in. wide to allow for variances in the joists, and rolls out 6 ft to cover 24 square ft.
|
|

If desired the ends of the bamboo can be trimmed using a fine tooth saw. Trimming is only required when Installing more than 2 EZ Attic flooring units side by side. No trimming is required when skipping joists in between units.
|
|

Using the provided hook nails secure the EZ Attic to the attic joist. Nail into joist though the space in the bamboo so that the nail hooks over the bamboo. At minimum place one nail at each corner of the Mat and at least one on each side and two in the matt area. Nail secure, but do not crush bamboo.
|
Clean out your closets and get organized!
|